All Projects

Community Projects (Morgan Hill)

Butterfield Boulevard (North)
City of Morgan Hill. Improved over 1.6 mile of four-lane divided arterial through the urbanized neighborhood to serve as a major thoroughfare to relieve traffic congestion in the north-south direction between Central Avenue and Tennant Avenue.

Key Contributions: Topographic Surveys, Right of Way Engineering, Roadway & Intersection design, Wet Utility design, Flood control, Construction Survey and Record of Survey

 

Morgan Hill Community & Cultural Center
City of Morgan Hill. Community & Cultural Center Improvements including Gavilan College & the Playhouse

Key Contributions: Topographic & Land Survey; Site Engineering; ADA accessibility; Frontage street & Intersection design; Wet Utility design; Stormwater analysis and engineering; Construction Survey

 

Morgan Hill Library
City of Morgan Hill. Morgan Hill (Santa County Library District) Library Improvements

Key Contributions: Topographic & Land Survey; Site Engineering; Frontage street & Intersection design; Wet Utility design; Stormwater analysis and engineering; Construction Survey


Morgan Hill Development Services Center
City of Morgan Hill, Development Services Center Improvements

Key Contributions: Topographic Survey; Site Engineering; Wet Utility design; ADA accessibility; Stormwater analysis and engineering; Construction Survey

 

Butterfield Boulevard (South Extension)
City of Morgan Hill. Improved approximately 0.8 mile of 4 lane divided arterial through the rural neighborhood to serve as a major thoroughfare to relieve traffic congestion in the north-south direction between Tennant Avenue and Watsonville Road with a bridge crossing over the railroad tracks (UPRR). Regional flood control basin at Maple and Seymour Avenue

Key Contributions: Right of Way Engineering; Roadway & Intersections; Fisher Avenue Realignment; Watsonville Road Realignment; Flood Control Analysis & Engineering; Construction & Record of Survey

Tennant Avenue widening
City of Morgan Hill. Developed plans and specifications for widening of this arterial between Vineyard Blvd and Monterey Road to include striping & signing plans and traffic signal modification design coordination.

 

Hale Avenue Official Plan Line
City of Morgan Hill. Developed official plan for future arterial roadway between Main Avenue to Watsonville Rd

Key Contributions: Setup controls for aerial survey; developed conceptual road alignment & intersection geometrics, Community outreach, coordinated design SC County Roads & Airport and provided EIR coordination

 

SkatePark @ Morgan Hill Centennial Recreation Center
City of Morgan Hill. Skate Park and parking improvements

Key Contributions: topographic survey, site engineering, and construction survey)

 

Water Resources Projects (Santa Clara County)

Little Llagas Creek Re-alignment with Hidden Creek residential developments

Key Contribution: engineered and developed plans and specifications for grading of flood channel, structural design of all box culvert crossings under City streets from Central Avenue to the south of Maple Avenue; engineering of relocation and new sewer, storm and water mains at box culvert crossings.

 

Downtown sanitary sewer bypass
City of Morgan Hill.

Key Contribution: engineered and developed plans and specifications for an 18″ bypass main between Tennant Avenue and Main Avenue along the East side of Southern Pacific Railroad.

Gilroy Country Club, sewer system and water system engineering

Key Contribution: Engineered 2.5 miles of trunk sewer to include a bore and jack design at two locations under State Highway 152 and Santa Teresa Blvd (County maintained road). Municipal water system with the creation of two new pressure zones with three triplex booster pump stations and standby power and telemetry, including four million gallon water storage design.

100 year Flood Channel and Maple Avenue Regional Flood Control Detention Facility (Butterfield Blvd.)
City of Morgan Hill.

Key Contribution: engineered and developed plans and specifications for grading of flood channel; structural design of all box culvert crossings under City streets from Central Avenue to the south of Maple Avenue; engineering of relocation and new sewer, storm and water mains at box culvert crossings; coordination of dry utility relocations.

Hydrology and hydraulic analysis of regional detention basin spread over 37 acres of land at Maple Ave and Seymour Avenue; Butterfield flood channel inflow-outflow modeling into the basin; engineered and developed plans and specifications for grading of the detention basin, storm drains, inflow-outflow structures and maintenance roads.

 

Single Family Residential Developments (Morgan Hill)

Key Contributions: Topographic survey, master land planning, street circulation studies, entitlements, site engineering, sewer, water and drainage systems and construction survey.

Coyote Estates, Peet Road & Malaguerra Ave

Mission Ranch, Cochrane & Mission View Drive

Alicante Estates, Cochrane & Peet Road

Capriano, Hale Avenue, and Tilton Avenue

The Ranch, Cochrane Road

Carol Estates, St Marks Avenue

Ventura, Cochrane Road

Valencia, Central Ave and Butterfield Blvd.

Connemara, Watsonville Road

Sherimar Ranch, Jasmin Way @ Diana Avenue

Milano, Murphy Avenue

Mill Creek, Watsonville Road

Hamilton Square, Watsonville Road

Springhill Estates, Spring Avenue

Jackson Meadows, East Dunne Avenue,

Hidden Creek Development, La Crosse Drive

Sparhawk Estates, Llagas Road

Llagas Creek Estates, Llagas Road

Diana Estates, Diana Avenue

Mill Creek, Watsonville Road

Hamilton Square, Watsonville Road

Springhill Estates, Spring Avenue

Morgan Ranch, Diana Avenue

Portola Ranch, East Main Avenue

Sonora Ranch, East Dunne Avenue

Sunrise Meadows, East Main Avenue

San Pedro Gardens, San Pedro Avenue,

The Willows, Edmundson Avenue

 

Multi-Family Residential Developments (Morgan Hill)

Key Contributions: topographic survey, master land planning, street circulation studies, entitlements, site engineering, sewer, water and drainage systems and construction survey.

Madrone Plaza, Butterfield Blvd @ Main Avenue

Huntington Square, Butterfield Blvd @ Main Avenue

Monterey Dynasty, Monterey Rd @ Rome Avenue

Bella Terra, Diana Avenue @ Butterfield Blvd.

Butterfield Station, Diana Avenue @ Butterfield Blvd.

Commercial /Industrial Subdivisions (Morgan Hill)

Key Contributions: Topographic survey, master land planning; street circulation studies, entitlements, site engineering, sewer, water and drainage systems and construction survey

Cochrane Business Park, Cochrane Rd & Monterey Rd.

Tennant Avenue Business Park, Tennant Ave and Vineyard Blvd.

 

Retail Projects (Santa Clara County)

Key Contributions: Topographic survey, master land planning, street circulation studies, entitlements, site engineering, sewer, water and drainage systems, and construction survey.

Gilroy Travel Park, Travel Park Cir @ Bolsa Road

Gateway Center, Monterey Road @ Cochrane Rd

Honda Dealership, Laurel Road

Ford Dealership, Condit Road

Holiday Inn Express, Condit Road

La Quinta, Condit Road

Peterson Trucks, Sycamore Avenue

Camping World of San Martin, Sycamore Avenue

Pan Pacific RV, Condit Road

Trader Joe’s, Walnut Grove Drive

 

Hillside Estates (Santa Clara County)

Key Contributions: Topographic survey, master land planning, street circulation studies, entitlements, site engineering,  sewer, water and drainage systems, and construction survey.

Gilroy Country Club (Gilroy), Mantelli Drive

Calero Lake Estates, McKean Drive

Cordevalle Country Club, Highland Avenue

Key Contributions: entitlements, land survey & mapping, construction survey

 

San Benito County  

Orchard Road-developed plans to rebuild 1 1/2 miles of a County Road.

Key contributions: topographical survey, improvement plans, soils investigation coordination construction staking, right of way documentation and construction administration.

Cienega Road Landslide Repair-engineered plans to rebuild 1.2 miles of a County Road in 8 locations damaged by a landslide.

Key contributions: set controls for an aerial survey; soil investigation coordination; retaining wall design; improvement plans & construction staking

Cienega Road Realignment-arterial road realignment & engineering

Key Contribution: set controls for aerial survey, alignment studies, box culvert design, improvement plans, the right of way acquisition legal descriptions, soils investigation coordination.

Fairview/ Fallon Road Realignment-arterial road realignment & engineering

Key Contribution: topographic survey, engineered plans for super-elevated realigned roadway.

Tract No. 335: residential development @ Santa Ana Road & Gardenia

Sparling Ranch Open Space and Conservation Easement mapping

Ecos Energy Solar Farm – Buena Vista Road

Dassel’s Petroleum: industrial storage yard improvements

Tortola Way: 4 lot residential subdivision

Hollister

Key Contributions: Topographic survey, master land planning, street circulation studies, entitlements, site engineering, sewer, water and drainage systems and construction survey.

Creekside 6, a single family residential development, Los Altos Drive @ Hillcrest Road, Hollister

Creekside 5, a single family residential development, Cypress Court, Hollister

Sherwood Forest, a single family residential development, Prune Street, Hollister

Parkside, a single family residential development, Sunnyslope Road, Hollister

Eden West (Hacienda Square): 53 lot single-family residential development Line Street & Cannery Row

Apricot Lane: 102 lot single-family residential development @ Steinbeck Lane and Summer Drive

La Piedad Tortilla Factory: site improvements and building expansion

San Juan Bautista:

Key Contributions: Topographic survey, master land planning, street circulation studies, entitlements, site engineering, sewer, water and drainage systems and construction survey.

San Antonio Street: 5 Lot single-family residential development, San Antonio Street @ 7th Street

Seventh Street: 4 Lot single-family residential development @ 7th Street

Hillside Vistas: 27 lot single-family residential development, Third Street @ Donner Street

San Juan Brewery: Mixed use commercial project on Third Street @ Pearce Lane